Features:
• Precise weight and speed control
• Superior Pipe Handling
• Tough mobile carrier - completely self-contained drilling rig mounted on a 10 x 6 tridem carrier.
• Equipped to Drill - includes three inch/1500psi circulation pipping. Optional mud pump configurations and oil injection for DHD operation are available.
• Heavy duty Derrick and Tophead Drive - A 12.67m clearance between the spindle and the table on the RD20III provide plenty of room for 9M drill pipe.
Â
TECHNICAL SPECIFICATIONS:
Carrier
5.7m wheelbase, 39,010kg GVWR
Derrick dimensions
15.6m x 1.2m x 1.0m (LxWxD)
Feed system:
Pullback: 489kN x Ton                   Pulldown: 60.5kN x Ton
Drill Feed Rate: 6.7m/min
Fast Feed Up: (regen on): 42.9m/min        Fast Feed Down: 53.6m/min
Â
Jib boom & hoist:
Lifting Capacity: 1,814kg bare drum
Line Speed: 18.3m/min bare drum
Â
Casing hoist:
Lifting Capacity: 3,402kg maximum
Line Speed: 18.3m/min maximum